Project 02

Supply, delivery and Installation of Replacement of Transformer OLTC System AVR Remote Control Panel for Power Transformer at Sub 11, MRCSB

Client:

Malaysian Refining Company Sdn Bhd

Period:

Commence period and completed during TA 2022

Description:

The equipment engineering, supply, installation and commissioning is part of MRCSB Refinery Assert rejuvenation Tiga Project Phase 2.0 (year 2021).

It is to ensure MRCSB’s assets, plant and other facilities within MRCSB vicinity are safe and reliable for continuous operation without any major failure or breakdown for the next 20 years.

The project was successfully completed in the month of June during the plant’s project shutdown TA2022.