Project 01
Smart Breather System installation for 275/33Kv Power Transformer
Client:
PRPC Utilities and Facilities Sdn Bhd
Period:
October – December 2020
Description:
Installation and commissioning of the Smart Breather system, it was a project to upgrade from conventional dehydrating breather to digital maintenance-free dehydrating breather for power transformer management at the substation in Petronas PRPC UF plant.