Supply, delivery and Installation of Replacement of Transformer OLTC System AVR Remote Control Panel for Power Transfor at Sub 11, MRCSB

The equipment engineering, supply, installation and commissioning is part of MRCSB Refinery Asseret rejuvenation Tiga Project Phase 2.0 (year 2021). It is to ensure MRCSB’s assets, plant and other facilities within MRCSB vicinity are safe and reliable for continuous operation without any major failure or breakfown for the next 20 years. The project was successfully completed in the month of June during the plant’s project shutdown TA2022.

Task

Supply, delivery and Installation of Replacement of Transformer OLTC System AVR Remote Control Panel for Power Transfor at Sub 11, MRCSB

  • Client

    Malaysian Refining Company Sdn Bhd